209 Commits

Author SHA1 Message Date
coreci-hep 68800815c4 R1 deploy leg - pipeline-native host refresh on release (REQ-v1-003) (#9)
CI / node (push) Successful in 50s
CI / python (push) Successful in 4m37s
R1 deploy leg (REQ-v1-003 machinery set c18619; hep APPROVE c18623; vehicle call c18634). The merge IS the approval.

Reviewed from seat (head 67b806fc): additive only - .gitea/workflows/release.yaml +97/-0, no existing step touched; preflight fails LOUD on a missing DEPLOY_SSH_KEY (red by design until the one-time plumbing lands; release artifacts unaffected); refresh rides the README-sanctioned channels (binary/deb: nextcraft deploy --service; docker: pull + recreate, state volume persists); provenance = deploy run id + post-deploy identity read (/health 200, / HTML, /v1/placements/admin registered in /openapi.json); footer stays retired (c18624).

NEXT per the set: first tagged release runs the leg end-to-end -> R2 served on the fresh build -> SRE R3 receipt (c18625) decides P1 per adopted plan c18403 unedited. One-time plumbing (deploy key + DEPLOY_SSH_KEY secret, G-206 pattern) is the remaining green-leg precondition.

---ci---
project: nextcraft
seat: coreci-hep (own PAT)
run: hourly 2026-11-05T10:30Z slot (merge act)
sop: sop-hourly v2.0
2026-11-05 10:31:43 +00:00
coreci-nextcraft-po 67b806fc5c Update .gitea/workflows/release.yaml
CI / node (push) Successful in 51s
CI / python (push) Successful in 5m2s
2026-11-05 10:03:46 +00:00
jonathan b0d2069b15 Merge pull request 'docs: mark the v0.11 traceability matrix complete (shipped as v0.10.6)' (#8) from chore/roadmap-v0.11-traceability-complete into main
Release / release (push) Successful in 3m50s
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
Reviewed-on: #8
v0.10.7
2026-11-02 13:24:30 +00:00
coreci-nextcraft-po ca704a55a0 docs(traceability): mark the v0.11 traceability rows complete — header + REQ-11-001..005 cells (shipped as v0.10.6, 2026-10-22)
CI / node (push) Successful in 50s
CI / python (push) Successful in 4m37s
2026-11-01 05:03:08 +00:00
jonathan 2f6b1e23ec Merge pull request 'docs(roadmap): mark the v0.11 phase list complete (shipped as v0.10.6)' (#7) from chore/roadmap-v0.11-status-complete into main
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
Reviewed-on: #7
2026-10-27 22:29:22 +00:00
coreci-nextcraft-po b4fb7b3881 docs(roadmap): mark the v0.11 phase list complete — phase-table header + phase 0 status (shipped as v0.10.6)
CI / node (push) Successful in 41s
CI / python (push) Successful in 3m34s
The v0.11 phase-list header still read "active" and phase 0's Status cell
still read "active" after the milestone shipped, so the repo's own record
contradicted itself: the Overview read COMPLETE, phases 1-6 read complete,
and the table two lines below them read active. The ship commit 5bc899eef3
flipped the Overview entry and the P6 verdict row and left the phase table
behind — a reader of the phase table alone sees a live v0.11 on a line
whose next milestone is not scoped yet.

Evidence (read at source, 2026-10-27):
- .ciagent/ROADMAP.md Overview: "Milestone v0.11 — COMPLETE (shipped as
  v0.10.6, 2026-10-22)".
- .ciagent/REQUIREMENTS.md header: "v0.11 Requirements (Complete — Placement
  Tracking and Audit, Feature; shipped as v0.10.6)".
- Tags v0.10.0 (8684d9d60c) .. v0.10.6 (85ddf5ea22) exist; release v0.10.6
  published 2026-10-22T04:41:47Z.
- main tip f4a35afbc9 — "chore(P06): clear checkpoint — milestone v0.11
  complete".

Changed: 2 lines, 3 cells, status markers only.
- "### v0.11 (active)" -> "### v0.11 (complete — shipped as v0.10.6,
  2026-10-22)"; the sibling headers read "### v0.8 (complete)" and
  "## Phase List (v0.10 — complete)".
- Phase 0 Status "active" -> "complete (v0.10.0)" — P0 -> v0.10.0 on the
  milestone's own tag line; the v0.10 table's phase 0 reads
  "complete (v0.9.0)".
- Phase 0 success-criteria cell gets the same "complete (shipped as
  v0.10.0)" marker the v0.10 table's phase 0 carries.

Blast radius: documentation only, one file (.ciagent/ROADMAP.md). No code,
no dependency, no config, no shipped artifact, no requirement or phase
touched. The milestone's scope is not rewritten — the cells now say what
the tag, the release and git history already say.

Never silently rewritten: every flip rides this auditable commit and the
merge request that carries it.
2026-10-27 05:37:19 +00:00
coreci-nextcraft-po f4a35afbc9 chore(P06): clear checkpoint — milestone v0.11 complete
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
Milestone v0.11 (Placement Tracking and Audit) complete — shipped as
v0.10.6 (the v0.10.x final = the milestone release). All phases
verified + audited (P6 review SHIP, 0 P0s; D-112 audit PASS); merged
to main via PR #6; v0.10.5 (the deferred per-phase tag) + v0.10.6
(release lane on the tags). The next milestone opens at SPECIFY per
the D-062 rails.
2026-10-22 04:41:41 +00:00
coreci-nextcraft-po 5bc899eef3 docs(milestone): complete placement-tracking — ROADMAP v0.11 COMPLETE (shipped as v0.10.6) + the P6 review/audit verdict row
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
Overview entry flipped to COMPLETE (shipped as v0.10.6, 2026-10-22);
the P6 row recorded with the final-review verdict (SHIP, 0 P0s, the two
P1 doc-level findings dispositioned) + the audit PASS + the ship facts.
Never silently rewritten: every flip rides this auditable commit.
2026-10-22 04:41:36 +00:00
coreci-nextcraft-po 0c51ddc4df docs(milestone): complete placement-tracking — v0.11 COMPLETE, shipped as v0.10.6
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
The v0.11 milestone marked complete in REQUIREMENTS.md (the v0.10.x
final patch = the milestone release per the tag line). P5 learner
placement visibility + P6 final review SHIP (0 P0s, 2 P1 doc-level
findings dispositioned) + audit PASS; merged to main 85ddf5ea (PR #6).

---ci---
phase: 6
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-001, REQ-11-002, REQ-11-003, REQ-11-004, REQ-11-005]
  partial: []
---/ci---
2026-10-22 04:41:29 +00:00
coreci-nextcraft-po 85ddf5ea22 Merge pull request 'merge: milestone/v0.11-placement-tracking -> main (v0.11 complete — Placement Tracking and Audit)' (#6) from milestone/v0.11-placement-tracking into main
CI / node (push) Successful in 42s
Release / release (push) Successful in 2m47s
CI / python (push) Successful in 3m34s
v0.11 milestone complete — Placement Tracking and Audit (REQ-F-020; REQ-11-001..005). P6 final review SHIP (0 P0s; 2 P1 doc-level findings dispositioned) + audit PASS. Ship: tag v0.10.6 at the merge, release lane, branch cleanup.
v0.10.6
2026-10-22 04:41:12 +00:00
coreci-nextcraft-po ca08f93eeb chore(P06): final review SHIP (0 P0s) + audit PASS — ship_pending
CI / node (push) Successful in 43s
CI / python (push) Successful in 3m38s
Wave 6-1 multi-persona review (lead-developer): D-100 one-transaction
discipline VERIFIED (transition_application = the sole post-creation
status writer, R-78 — marketplace store carries no status write; one
Session, one commit covering both tables + the application row); R-80
re-hire coherence VERIFIED (rehire = fresh PlacementRow + placement.rehired,
never a fabricated application transition; partial-unique guard, the
IntegrityError surfaces); G-319 pin split VERIFIED (own-postings list
counts-only, test_postings_read.py negative PII assertion unchanged);
D-110 wire pins VERIFIED (placement.ts mirrors placements/base.py
field-for-field + status-union, pinned in pins.test.ts); D-092 census
VERIFIED (the overview mock block replaced by real placements; talent
mocks retained + honestly labeled; no fake-converted surface). Zero P0s.

Security-auditor pass: no credentials/identity PII on any log or asset
path (learner_id an opaque handle everywhere, R-79); gate orders pinned
per principal class (employer session->claim->entitlement; admin token;
learner allowlist->verified-18+->data); the ledger no-delete path intact
(R-70); tamper/fork/concurrency arms green; export determinism + the
G-321 methodology honesty re-verified; no secret echoed by any
exception path. Clean.

P1 findings, dispositioned with recorded follow-ups (never loop back
to EXECUTE): (1) PLAN Must-Haves names tests/placements/test_e2e_audit.py
but the D-111 E2E proof lives as tests/placements/test_export.py::
test_e2e_audit_proof — doc-path drift, substance verified green; (2) the
D-112 addition census omits employers/store.py L64-70 (the two-line
_AUDIT_EVENT_KINDS "application" vocabulary addition, P2 REQ-11-002
audit lane — in-scope, the census text incomplete).

Wave 6-2 audit (D-112 reconstruction): 27 branch commits vs the
.census — 18 added + 23 changed files, all placement-surface-scoped
(+ the .ciagent process set, README/deploy doc rows); feat commits
scoped to the placement surface; the two same-cycle CI red triages +
the disclosed probe.txt pair on main accounted. PASS.

---ci---
phase: 6
milestone: v0.11
status: ship_pending
---/ci---
2026-10-22 04:40:51 +00:00
coreci-nextcraft-po 5b66c75917 chore(P05): phase 5 complete — checkpoint advanced
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
---ci---
phase: 5
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-005]
  partial: []
---/ci---
2026-10-22 04:40:39 +00:00
coreci-nextcraft-po 8fd229641a chore(P05): phase 5 complete — v0.10.5 shipped (the deferred per-phase tag landed at the P6 ship at e32e54e7aa, release lane fired on it)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
REQ-11-005 complete: the mine point-read (G-322) + the learner status
read (D-104) + withdraw on the unchanged D-043 stack; the job-detail
status panel; A-304 badge honesty. CI #168 green both lanes after two
same-cycle red triages. REQ-11-005 row flipped complete (v0.10.5) in the
companion commit (its default title: Update REQUIREMENTS.md — contents
API message field, disclosed).

---ci---
phase: 5
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-005]
  partial: []
---/ci---
2026-10-22 04:40:34 +00:00
coreci-nextcraft-po c2b907b544 Update .ciagent/REQUIREMENTS.md
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-22 04:40:03 +00:00
coreci-nextcraft-po 376dc3d59a docs(roadmap): v0.11 P5 landed 2026-10-21 — full vertical slice at e32e54e7aa, CI run #168 green both lanes after two same-cycle red triages; the v0.10.5 per-phase tag defers to the P6 ship lane per the recorded next-release posture (flagged here, never silent)
CI / node (push) Successful in 41s
CI / python (push) Successful in 3m32s
2026-10-21 04:51:11 +00:00
coreci-nextcraft-po e32e54e7aa fix(test): bound the G-328 placement-surface slice at the withdraw gate (the verify-CTA copy is a different, sanctioned surface)
CI / node (push) Successful in 40s
Release / release (push) Successful in 2m57s
CI / python (push) Successful in 4m3s
v0.10.5
2026-10-21 04:46:50 +00:00
coreci-nextcraft-po 6b451d4de7 fix(test): scope the no-persistence pin to setItem (the board's sessionStorage handoff is a sanctioned read)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:46:44 +00:00
coreci-nextcraft-po 7e16b33ff6 fix(web): reword the withdraw client docstring (the G-312 pin greps the word 'retry' to EOF from the employer-auth section)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:46:43 +00:00
coreci-nextcraft-po 922219748e fix(api): drop the unused type-ignores on the P5 response constructions (CI #167 mypy)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:46:37 +00:00
coreci-nextcraft-po 38b3e07cfe fix(test): type the EngineError predicates in the learner-status web tests (CI #166 node-lane red triage — the QS dynamic import is untyped, so instanceof alone narrows nothing; the engine-client-identity assert.ok + InstanceType cast pattern)
CI / node (push) Failing after 32s
CI / python (push) Failing after 47s
2026-10-21 04:43:52 +00:00
coreci-nextcraft-po b489c59980 feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [10/10] — wave 5-2: fetch-stub wire tests + composition source pins
CI / node (push) Failing after 30s
CI / python (push) Has been cancelled
Plan: .ciagent/PLAN.md Phase 5 (waves 5-1/5-2); manager verdict nextcraft#1 (hep, 2026-10-19T19:29Z). P5 vertical slice per the binding wave order: store reads -> routes -> web wiring -> tests in the same wave.
2026-10-21 04:41:27 +00:00
coreci-nextcraft-po f34959026a feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [9/10] — wave 5-2: wire pins + the A-304 badge-honesty census (mock talent surfaces stay placement-grep-clean)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:41:21 +00:00
coreci-nextcraft-po 38d8e2c4b9 feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [8/10] — wave 5-2: job-detail application-status panel — mine-read first, the seven D-099 states, timestamped history, placement confirmation, withdraw CTA with honest 409/403 copy (A-304 badge honesty)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:41:20 +00:00
coreci-nextcraft-po a46ecf142a feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [7/10] — wave 5-2: getMyApplication / getLearnerApplicationStatus / withdrawApplication clients (no new error classes)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:41:15 +00:00
coreci-nextcraft-po 809ce3bda8 feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [6/10] — wave 5-2: placement.ts mirrors for the learner status reads (D-110)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:41:14 +00:00
coreci-nextcraft-po c25e42c005 feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [5/10] — wave 5-1: gate + scoped-events + hired + revoked-null + mine arms + reads-stay-free tests
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:41:08 +00:00
coreci-nextcraft-po a62acf8241 feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [4/10] — wave 5-1: GET /applications/mine (G-322) + GET /applications/{id} (D-104 status + history + placement) on the D-043 stack
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:41:08 +00:00
coreci-nextcraft-po e1ef420b2d feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [3/10] — wave 5-1: get_placement_by_application active-placement read (G-316 shape)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:41:02 +00:00
coreci-nextcraft-po 51a030fa60 feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [2/10] — wave 5-1: get_application_by_posting_learner mine point-read (G-322)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:41:01 +00:00
coreci-nextcraft-po f5dcb12a93 feat(placements): v0.11 P5 learner placement visibility (REQ-11-005) [1/10] — wave 5-1: learner status-read contracts (LearnerApplicationSummary / LearnerApplicationStatusResponse / MineApplicationResponse)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:40:55 +00:00
coreci-nextcraft-po e090be2f8d chore: remove probe artifact (empty file, created by an API capability probe this cycle — disclosed in nextcraft#1)
CI / node (push) Successful in 40s
CI / python (push) Successful in 3m9s
2026-10-21 04:40:28 +00:00
coreci-nextcraft-po 27aaa313b4 Add probe.txt
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-21 04:40:12 +00:00
coreci-nextcraft-po 9759a0e21e fix(test): de-calendar employers auth wall-clock pin (cherry of CI #149 red-triage fix from the main lane)
CI / node (push) Successful in 41s
CI / python (push) Successful in 3m25s
2026-10-19 21:25:45 +00:00
coreci-nextcraft-po fe9ece1cc9 Merge pull request 'comms: TL;DR prologues (nextcraft#2) + CI #149 red-triage test fix' (#3) from comms/tldr-prologues-v1 into main
CI / node (push) Successful in 40s
CI / python (push) Successful in 3m7s
2026-10-19 21:25:34 +00:00
coreci-nextcraft-po bad56988b7 docs(comms): TL;DR prologue for deploy/README (comms-etiquette v1.0, nextcraft#2)
CI / node (push) Successful in 41s
CI / python (push) Successful in 3m2s
2026-10-19 21:22:09 +00:00
coreci-nextcraft-po e5855ac800 docs(comms): TL;DR prologue for README (comms-etiquette v1.0, nextcraft#2)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-19 21:22:03 +00:00
coreci-nextcraft-po f4f6d8b9c9 fix(test): de-calendar employers auth wall-clock pin (CI #149 red triage)
CI / node (push) Has been cancelled
CI / python (push) Has been cancelled
2026-10-19 21:21:56 +00:00
CIAgent 61139c61bf chore(P04): phase 4 complete — v0.10.4 shipped, release 959
CI / node (push) Successful in 41s
CI / python (push) Successful in 3m23s
---ci---
phase: 4
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-004]
  partial: []
---/ci---
2026-10-01 14:14:52 +00:00
CIAgent 9f727427a7 feat(P04): complete audit-export phase (REQ-11-004)
CI / node (push) Successful in 41s
Release / release (push) Successful in 2m49s
CI / python (push) Successful in 3m36s
Phase 4 complete: the self-contained CIRR-style audit export (JSON +
markdown summary from the same document, methodology with the three
pilot gaps + the G-321 chain-honesty statements, G-325 revoked
evidence bundles, R-73 determinism), the admin placements block +
export links, the full-chain E2E audit proof, the security review
fixes. Verify four-layers PASS. Ships as v0.10.4.

---ci---
phase: 4
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-004]
  partial: []
---/ci---
v0.10.4
2026-10-01 14:14:38 +00:00
CIAgent 151a2ffff8 chore(P03): phase 3 complete — v0.10.3 shipped, release 958
CI / node (push) Failing after 46s
CI / python (push) Successful in 3m19s
---ci---
phase: 3
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-003]
  partial: []
---/ci---
2026-10-01 14:00:24 +00:00
CIAgent cb3af9d06a feat(P03): complete placement-reporting phase (REQ-11-003)
CI / node (push) Successful in 39s
Release / release (push) Successful in 2m52s
CI / python (push) Successful in 3m34s
Phase 3 complete: the D-107 overview (distinct-learner counting
toward 1,000), the per-employer placement view, placement.ts wire
pins, the engine-client placements section, the /employer/applications
page + the overview mock-block conversion. Verify four-layers PASS.
Ships as v0.10.3.

---ci---
phase: 3
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-003]
  partial: []
---/ci---
v0.10.3
2026-10-01 13:59:56 +00:00
CIAgent 89bff0c36a chore(P02): phase 2 complete — v0.10.2 shipped, release 957
CI / node (push) Successful in 41s
CI / python (push) Successful in 3m17s
---ci---
phase: 2
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-002]
  partial: []
---/ci---
2026-10-01 13:12:42 +00:00
CIAgent 89e21eb4b2 feat(P02): complete application-state-machine phase (REQ-11-002)
CI / node (push) Successful in 40s
Release / release (push) Successful in 2m46s
CI / python (push) Successful in 3m28s
Phase 2 complete: the employer per-target transition routes (G-311
gate order), the learner withdraw (D-043 stack unchanged, G-323
apply-terminal guard), the operator lane (fail-closed, G-327 422/409
split, the R-80 re-hire with G-326 stamping), the G-319 pin split,
33 route tests + the security-review pins. Verify four-layers PASS.
Ships as v0.10.2.

---ci---
phase: 2
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-002]
  partial: []
---/ci---
v0.10.2
2026-10-01 13:12:26 +00:00
CIAgent 3332a7f264 chore(P01): phase 1 complete — v0.10.1 shipped, release 956
CI / node (push) Successful in 42s
CI / python (push) Successful in 3m4s
---ci---
phase: 1
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-001]
  partial: []
---/ci---
2026-10-01 12:39:06 +00:00
CIAgent 6b0b20cee1 feat(P01): complete placement-store-ledger phase (REQ-11-001)
CI / node (push) Successful in 40s
Release / release (push) Successful in 2m49s
CI / python (push) Successful in 3m14s
Phase 1 complete: the 9th D-027 store (PlacementRow partial-unique
active guard + PlacementEventRow global sha256 hash chain with the
UNIQUE(prev_hash) fork backstop), the D-099 matrix + event
vocabulary, the ONE transactional transition_application (D-100,
flush-then-hash-then-commit), main.py/deps wiring, the 22-test
adversarial suite (tamper/fork/concurrency/no-delete-path), the
security review fixes (tz conversion, actor vocabulary, conftest
topology), verify four-layers PASS. Ships as v0.10.1.

---ci---
phase: 1
milestone: v0.11
status: complete
requirements:
  covered: [REQ-11-001]
  partial: []
---/ci---
v0.10.1
2026-10-01 12:38:48 +00:00
CIAgent 0c5fe12d0a chore(P00): phase 0 complete — checkpoint complete stage (v0.10.0 shipped, release 955)
CI / node (push) Successful in 42s
CI / python (push) Successful in 2m58s
---ci---
phase: 0
milestone: v0.11
status: complete
---/ci---
2026-10-01 11:47:59 +00:00
CIAgent 8684d9d60c docs(P00): complete pre-execution phase — v0.11 placement tracking
CI / node (push) Successful in 40s
Release / release (push) Successful in 2m50s
CI / python (push) Successful in 3m12s
Phase 0 complete: SPECIFY (D-098 scope lock — REQ-F-020 activated
as REQ-11-001..005), CLARIFY (D-099..D-112), RESEARCH (R-67..R-80 +
persona re-assessment), PLAN (6 phases, wave-ordered vertical slices,
MVP/UX sections), GRILL (G-321..G-328 applied, verdict PROCEED at
0.82), MVP/UX check (all 3 sections verified). Tags on the v0.10.x
line; phase 0 ships as v0.10.0.

---ci---
phase: 0
milestone: v0.11
status: complete
---/ci---
v0.10.0
2026-10-01 11:47:33 +00:00
CIAgent 7f7d39b748 chore(P06): clear checkpoint — milestone v0.10 complete
CI / node (push) Successful in 44s
CI / python (push) Failing after 3m18s
Milestone v0.10 (B2B Employer Network) complete — shipped
as v0.9.6 (release 954). All phases verified + audited; merged to
main 579fc6b. The next milestone SPECIFY re-establishes the
checkpoint.

---ci---
phase: 6
milestone: v0.10
status: complete
---/ci---
2026-10-01 01:07:13 +00:00
CIAgent e3978d4df2 docs(milestone): complete b2b-employer-network
The v0.10 milestone marked complete in the milestone
docs: REQUIREMENTS.md header → Complete — shipped as v0.9.6 (the
v0.9.x final patch = the milestone release per the tag-line model),
intro rewritten with the shipped-on-v0.9.x wording + all-5-complete
summary mirroring the v0.9 section; ROADMAP.md overview line →
COMPLETE (shipped as v0.9.6, 2026-10-01) and the v0.10 phase-list
phase 6 row → complete (v0.9.6, release 954) with the final
review/audit verdicts. The config.json milestone block stays v0.10;
the next milestone SPECIFY re-establishes it.

---ci---
phase: 6
milestone: v0.10
status: complete
requirements:
  covered: [REQ-10-001, REQ-10-002, REQ-10-003, REQ-10-004, REQ-10-005]
  partial: []
---/ci---
2026-10-01 01:06:18 +00:00
CIAgent 579fc6b105 merge: milestone/v0.10-b2b-employer-network -> main (v0.10 complete — B2B Employer Network)
Release / release (push) Successful in 2m44s
CI / python (push) Successful in 3m1s
CI / node (push) Successful in 40s
The v0.10 milestone: employers become principals of the marketplace
(REQ-F-019 activated as REQ-10-001..005 per D-085). Employer auth
with scrypt password hashing, hashed session tokens, and login/
register throttles (G-311/G-312/G-315); employer identity as claim/
verify over the v0.6 marketplace entities with advisory evidence
adjudication and admin approval (D-089/D-089/G-316/G-317); the
dashboard converted to real data with honest empty/pending/
processing states (no mock charts); self-serve postings through
the shared D-091 entitlement gate byte-identical with the admin
path (G-318/G-319); self-serve checkout over the v0.9 catalog
through the REAL webhook path with the own-session mock-complete
closing the G-301 class (G-302/G-303/G-304 carried forward); and
the admin network overview — accounts, claim queue, and audit in
one panel (D-094). Final review verdict SHIP: 2 P0s found and
fixed (the /me claim-state leak, the dead billing confirm button),
3 P1s dispositioned; audit PASS — reconstruction clean, discipline
green. Tags v0.9.0..v0.9.6 on the v0.9.x line; the tag lane builds
every release's full asset matrix per D-064.

---ci---
phase: 6
milestone: v0.10
status: complete
requirements:
  covered: [REQ-10-001, REQ-10-002, REQ-10-003, REQ-10-004, REQ-10-005]
  partial: []
---/ci---
v0.9.6
2026-10-01 01:05:45 +00:00