What changes

1 line + 5 status cells in one documentation file: .ciagent/REQUIREMENTS.md Traceability Matrix — ### v0.11 (active) becomes ### v0.11 (complete), and the five REQ-11-001..005 traceability rows go planned to complete. No other byte moves.

Why

The v0.11 ship commit (5bc899eef3, 2026-10-22) flipped the file header ("v0.11 Requirements (Complete — ...; shipped as v0.10.6)") and every REQ-11-* requirement-row status, but left the Traceability Matrix section at the pre-execution wording — ### v0.11 (active) with five planned rows. A reader of the traceability table alone would see a live v0.11 on a line whose milestone shipped four days earlier. This is the same leave-the-status-table-behind class as the ROADMAP.md drift fixed in merge request #7 (merged 2026-10-27, commit 2f6b1e23ec); found live this cycle at main, blob 9aa88d19, lines 421..429. Flagged, never silently rewritten: the fix rides an auditable commit + reviewed merge request, same vehicle as #7.

How verified

  • Fix branch commit ca704a55a0; corrected blob cd6b92de re-read from the branch via the contents API: 0 occurrences of (active) in the file, all five REQ-11-0N traceability cells read complete, header v0.11 (complete).
  • Cross-check at main this cycle: ROADMAP.md (blob 070f543e) reads Milestone v0.11 COMPLETE (shipped as v0.10.6, 2026-10-22) and its v0.11 phase list reads complete (v0.10.1..v0.10.6) — the two files agree once this lands.
  • The gate runs on push (node + python lanes); the merge into main lands the corrected rows under a green main run id, per the acceptance shape used for #7.

Blast radius

One documentation file — no code, no dependency, no config, no shipped artifact, no requirement content, phase, criterion or tag touched; the traceability cells now say what the tags, the release (v0.10.6, published 2026-10-22) and git history already say. Milestone scope is not rewritten. If the approver declines, nothing lands and the drift stays flagged in the seat posture and heartbeat.

Machine notes

  • requestor: coreci-nextcraft-po
  • system: nextcraft-product-line
  • owner: coreci-hep
  • lane: L2
  • status: open
## What changes 1 line + 5 status cells in one documentation file: `.ciagent/REQUIREMENTS.md` Traceability Matrix — `### v0.11 (active)` becomes `### v0.11 (complete)`, and the five REQ-11-001..005 traceability rows go `planned` to `complete`. No other byte moves. ## Why The v0.11 ship commit (5bc899eef3, 2026-10-22) flipped the file header ("v0.11 Requirements (Complete — ...; shipped as v0.10.6)") and every REQ-11-* requirement-row status, but left the Traceability Matrix section at the pre-execution wording — `### v0.11 (active)` with five `planned` rows. A reader of the traceability table alone would see a live v0.11 on a line whose milestone shipped four days earlier. This is the same leave-the-status-table-behind class as the ROADMAP.md drift fixed in merge request #7 (merged 2026-10-27, commit 2f6b1e23eccc); found live this cycle at main, blob 9aa88d19, lines 421..429. Flagged, never silently rewritten: the fix rides an auditable commit + reviewed merge request, same vehicle as #7. ## How verified - Fix branch commit ca704a55a0; corrected blob cd6b92de re-read from the branch via the contents API: 0 occurrences of (active) in the file, all five REQ-11-0N traceability cells read complete, header v0.11 (complete). - Cross-check at main this cycle: ROADMAP.md (blob 070f543e) reads Milestone v0.11 COMPLETE (shipped as v0.10.6, 2026-10-22) and its v0.11 phase list reads complete (v0.10.1..v0.10.6) — the two files agree once this lands. - The gate runs on push (node + python lanes); the merge into main lands the corrected rows under a green main run id, per the acceptance shape used for #7. ## Blast radius One documentation file — no code, no dependency, no config, no shipped artifact, no requirement content, phase, criterion or tag touched; the traceability cells now say what the tags, the release (v0.10.6, published 2026-10-22) and git history already say. Milestone scope is not rewritten. If the approver declines, nothing lands and the drift stays flagged in the seat posture and heartbeat. ## Machine notes - requestor: coreci-nextcraft-po - system: nextcraft-product-line - owner: coreci-hep - lane: L2 - status: open
coreci-hep was assigned by coreci-nextcraft-po 2026-11-01 05:03:23 +00:00
coreci-nextcraft-po added 1 commit 2026-11-01 05:03:23 +00:00
Collaborator

TL;DR - Owner verdict from the product-line seat: verified; ready for the approving merge under the #7 vehicle (the merge is the approval).

What I checked live: main REQUIREMENTS.md (blob 9aa88d19) still reads ### v0.11 (active) with all five REQ-11 rows planned, while the milestone already shipped - tag v0.10.6, ship commit 5bc899eef3, 2026-10-22. The fix branch (ca704a55a0) changes exactly the nine named lines: heading plus five cells to complete; the header was already correct; zero (active) left in the file. Gate green on the branch (run 74354, node + python lanes).

Approver: no scope, requirement or milestone semantics move - the docs catch up to what the tags already say. If declined, nothing lands and the drift stays flagged in the seat records.

TL;DR - Owner verdict from the product-line seat: verified; ready for the approving merge under the #7 vehicle (the merge is the approval). What I checked live: main REQUIREMENTS.md (blob 9aa88d19) still reads ### v0.11 (active) with all five REQ-11 rows planned, while the milestone already shipped - tag v0.10.6, ship commit 5bc899eef3, 2026-10-22. The fix branch (ca704a55a0) changes exactly the nine named lines: heading plus five cells to complete; the header was already correct; zero (active) left in the file. Gate green on the branch (run 74354, node + python lanes). Approver: no scope, requirement or milestone semantics move - the docs catch up to what the tags already say. If declined, nothing lands and the drift stays flagged in the seat records.
jonathan merged commit b0d2069b15 into main 2026-11-02 13:24:31 +00:00
jonathan deleted branch chore/roadmap-v0.11-traceability-complete 2026-11-02 13:24:31 +00:00
Collaborator

TL;DR — post-merge verification complete, ledger tail closed.

Merged: ca704a55a0 → main as b0d2069b by jonathan at 2026-11-02T13:24:31Z (the approving merge per #7 — human merge = approval, v1.3). The merge landed within this seat's watch window; no self-merge occurred.

Blob verified on main (b0d2069b): .ciagent/REQUIREMENTS.md reads ### v0.11 (complete) with all five REQ-11-001..005 traceability rows complete (lines 421-429) — the exact blob this MR promised: 1 header + 5 cells, nothing else moved.

Verdict: v0.11 traceability record is now complete on main and verifiable in git. This seat's watch (owner verdict c16734 → approving merge → blob check) is done; no open items remain on this seat from this MR.

**TL;DR** — post-merge verification complete, ledger tail closed. **Merged:** ca704a55a0 → main as b0d2069b by jonathan at 2026-11-02T13:24:31Z (the approving merge per #7 — human merge = approval, v1.3). The merge landed within this seat's watch window; no self-merge occurred. **Blob verified on main (b0d2069b):** `.ciagent/REQUIREMENTS.md` reads `### v0.11 (complete)` with all five REQ-11-001..005 traceability rows `complete` (lines 421-429) — the exact blob this MR promised: 1 header + 5 cells, nothing else moved. **Verdict:** v0.11 traceability record is now complete on main and verifiable in git. This seat's watch (owner verdict c16734 → approving merge → blob check) is done; no open items remain on this seat from this MR.