---ci---
phase: 5
milestone: v0.2
status: complete
escalation:
type: deploy
hook: deploy
resolution: auto
directive: milestone release publication post-approval
message: >-
The approved milestone release v0.2.5 published. Gitea release
retitled to note the recorded approval (decision 4721c2a) and
G-009 ratification. The deployed container at
https://research.coreci.dev already serves the release content
(the v0.2.5-uat staging was built from the same milestone HEAD
as the merged release) - no redeploy needed. DEPLOY-RECORD
ledger row added; v0.2 milestone cycle closed.
requirements:
covered: []
partial: []
---/ci---
---ci---
phase: 5
milestone: v0.2
status: complete
message: >-
Milestone v0.2-mvp COMPLETE and APPROVED. Checkpoint cleared per
the run workflow: the next /ci-run starts milestone v0.3 at
phase 0 (pre-execution: specify, clarify, research, plan,
grill, mvp/ux check), which config.json now points at (tag line
v0.3.x). v0.3 scope is pending owner direction: live-bound
library/settings/suggestions/refine surfaces (G-009 ratified
scope), backend hosting for the LXC deployment, and the remaining
6 methodologies from the locked catalog.
requirements:
covered: [REQ-01, REQ-02, REQ-03, REQ-04, REQ-05, REQ-06, REQ-07, REQ-08, REQ-09, REQ-10, REQ-11, REQ-12, REQ-13, REQ-14, REQ-15, REQ-16, REQ-17, REQ-18, REQ-19, REQ-20, REQ-21, REQ-22, REQ-23, REQ-24, REQ-25, REQ-26, REQ-31, REQ-32, REQ-33, REQ-34]
partial: []
---/ci---
Milestone branch will be deleted (local + remote); tags
v0.2.0-v0.2.5 and the main merge (b11b202) preserve the full
history. v0.3 unblocked.
---ci---
phase: 8
milestone: v0.1
status: complete
message: >-
Milestone v0.1-prototype COMPLETE and APPROVED. Checkpoint cleared
per the run workflow: the next /ci-run starts milestone v0.2-mvp
at phase 0 (pre-execution: specify, clarify, research, plan),
which config.json now points at (tag line v0.2.x).
requirements:
covered: [REQ-52, REQ-53, REQ-54, REQ-55, REQ-56, REQ-57, REQ-58, REQ-59, REQ-60, REQ-61, REQ-62, REQ-63, REQ-64, REQ-65, REQ-66, REQ-67, REQ-68]
partial: []
---/ci---
Milestone branch deleted (local + remote); tags v0.1.0-v0.1.8 and the
main merge (d6ddcfe) preserve the full history. v0.2-mvp unblocked.
---ci---
phase: 8
milestone: v0.1
status: complete
escalation:
type: deploy
hook: deploy
resolution: auto
directive: milestone release publication post-approval
message: >-
The approved milestone release v0.1.8 deployed to the LXC host
(plain tag, not -uat): gates green at the tagged tree, container
swapped, health check passed. Gitea release renamed to note the
recorded approval. DEPLOY-RECORD ledger updated.
requirements:
covered: [REQ-62]
partial: []
---/ci---
Fifth deploy row: v0.1.8 (release) -> 93a7b57 at the tag. The
container at http://10.0.0.114:3000 now serves the approved
prototype.
Squash-merge of phase/08-final-review-approval-ship into milestone/v0.1-prototype. Review PASS-WITH-FIXES (double-compose + drawer-keyboard P1s, 90/90). Audit PASS-WITH-NOTES (all applied). Tag v0.1.8 = extended-prototype release candidate. Milestone merge to main HALTS at the REQ-62 owner approval gate.
---ci---
phase: 6
milestone: v0.1
status: approval_pending
escalation:
type: deploy
hook: deploy
resolution: auto
directive: push updates to lxc container
message: >-
Owner-directed UAT deploy of the extended prototype to the LXC
Docker host via the codified release system. Gates re-run green
(typecheck/lint/75 tests/build) at deploy time; image
researchx:v0.1.6-uat swapped in; health check + route smoke
passed. Approval gate UNCHANGED - the REQ-62 owner decision on
the milestone merge to main is still pending.
requirements:
covered: [REQ-52, REQ-53, REQ-54, REQ-55, REQ-56, REQ-57, REQ-58, REQ-59, REQ-60, REQ-61, REQ-63, REQ-64, REQ-65, REQ-66]
partial: [REQ-62]
---/ci---
DEPLOY-RECORD.md (new): ledger of owner-directed UAT stagings.
v0.1.6-uat -> 600b49c, healthy at http://10.0.0.114:3000 with the
app shell, library, and settings verified in served HTML. Checkpoint
remains approval_pending.
---ci---
phase: 4
milestone: v0.1
status: execute
persona: ci-lead-developer
task: T-4.2
requirements:
covered: [REQ-52]
partial: []
---/ci---
UAT variant now resolves the milestone branch by milestone number
(v0.1) not full tag version (v0.1.4), matching branch-strategy
labeling. DEPLOY_KEY (path in .env.secrets) preferred over passwords —
survives sshd PermitRootLogin prohibit-password (Ubuntu 24.04 default
that rejects root password auth; observed on the LXC host). Deployed
v0.1.4-uat for manual UAT: http://10.0.0.114:3000.
---ci---
phase: 4
milestone: v0.1
status: complete
escalation:
type: prototype_approval
hook: prototype_approval
resolution: pending_owner_decision
message: >-
Prototype complete and presented for approval. On recorded approval:
milestone merge to main, milestone branches deleted, v0.2 unblocked.
On rejection: feedback becomes binding decisions for a fix cycle.
requirements:
covered: [REQ-52, REQ-53, REQ-54, REQ-55, REQ-56, REQ-57, REQ-58, REQ-59, REQ-60, REQ-61]
partial: [REQ-62]
---/ci---
Ship record: PR #4 squash-merged phase/04-final-review-approval-ship →
milestone/v0.1-prototype (1d97788), tag v0.1.4, phase branch deleted
(local+remote), Gitea release v0.1.4 created (HTTP 201) with full
milestone summary. Review: PASS-WITH-FIXES, 5 P0s fixed in-phase.
Audit: PASS. Per REQ-62 and the prototype_approval escalation hook,
the milestone merge to main does NOT proceed autonomously — the
pipeline halts here for the recorded owner decision.
Final phase: full-milestone review PASS-WITH-FIXES (5 P0s fixed with tests), audit PASS, PLAN/CHECKPOINT advance. REQ-62 owner approval gate: milestone merge to main + v0.1.4 publication halt for recorded owner approval. Gates 42/42 green.