docs(P01): phase 1 shipped — checkpoint advances to phase 2 execute

---ci---
phase: 1
milestone: v0.1
status: complete
requirements:
  covered: [REQ-52, REQ-53, REQ-54, REQ-55, REQ-56]
  partial: []
---/ci---

Ship record: PR #1 squash-merged phase/01-frontend-scaffold-ask-choose →
milestone/v0.1-prototype (dd2538f), tag v0.1.1, phase branch deleted
(local+remote), Gitea release v0.1.1 created (HTTP 201). REQUIREMENTS
traceability REQ-52..56 → complete; ROADMAP P1 → complete, P2 → planned.
Post-hoc P1 flags (drawer hyphen rendering, empty-question guard) routed to
P4 pre-demo fixes; P1-3/P1-4 fold into P2.
This commit is contained in:
coreci
2026-09-27 00:44:57 +00:00
parent dd2538f33e
commit 59af9cb3d1
3 changed files with 9 additions and 9 deletions
+2 -2
View File
@@ -1,8 +1,8 @@
{
"phase": 1,
"stage": "verify",
"stage": "complete",
"milestone": "v0.1",
"phase_role": "execution",
"attempts": 0,
"updated_at": "2026-09-27T00:50:00Z"
"updated_at": "2026-09-27T00:55:00Z"
}
+3 -3
View File
@@ -103,9 +103,9 @@
## Traceability
| Requirement | Milestone | Phase | Status |
|---|---|---|---|
| REQ-52 (scaffold) | v0.1 | P1 | pending |
| REQ-53, REQ-54 (mock boundary) | v0.1 | P1 | pending |
| REQ-55, REQ-56 (Ask, Choose) | v0.1 | P1 | pending |
| REQ-52 (scaffold) | v0.1 | P1 | complete |
| REQ-53, REQ-54 (mock boundary) | v0.1 | P1 | complete |
| REQ-55, REQ-56 (Ask, Choose) | v0.1 | P1 | complete |
| REQ-57 (Plan & Run) | v0.1 | P2 | pending |
| REQ-58, REQ-59 (Reading Room, exports) | v0.1 | P2 | pending |
| REQ-60, REQ-61 (v2 mockups, 3-click) | v0.1 | P3 | pending |
+4 -4
View File
@@ -12,19 +12,19 @@ Two milestones, owner-directed 2026-09-27. **Milestone v0.1 — Prototype**: the
- **Depends on**: —
- **Status**: complete (squash-merged to milestone/v0.1-prototype, tag v0.1.0, release created)
### Phase 1 — Frontend Scaffold + Ask + Choose (next — blocked only by explicit owner hold; execution has NOT been started per bootstrap directive)
### Phase 1 — Frontend Scaffold + Ask + Choose (complete — shipped v0.1.1)
- **Description**: Next.js App Router scaffold (TypeScript strict, Tailwind, Vitest); typed `ApiClient` interface + `MockApiClient` (fixture data, scripted event replay); Ask screen (question + optional context); Choose screen with all 8 locked methodology cards (mock ETA/cost/why-recommended, dial summary) and the advanced dials drawer (progressive disclosure).
- **Requirements covered**: REQ-52, REQ-53, REQ-54, REQ-55, REQ-56
- **Success criteria**: `pnpm dev` renders Ask → Choose with 8 cards from mock data; dials drawer opens/closes; typecheck + lint + tests green
- **Depends on**: 0
- **Status**: not_started
- **Status**: complete (PR #1 squash-merged to milestone/v0.1-prototype, tag v0.1.1, release created)
### Phase 2 — Plan & Run + Reading Room v0
### Phase 2 — Plan & Run + Reading Room v0 (next)
- **Description**: Plan & Run screen (plan approval UI, scripted live trace stream, pause/cancel controls); Reading Room v0 (report reader, page-anchored citations with hover-to-quote, citation ledger panel, functional Markdown/JSON exports from mock data).
- **Requirements covered**: REQ-57, REQ-58, REQ-59
- **Success criteria**: scripted run replays end-to-end with live trace; hover shows exact quoted passage; exports download real files with citations as links
- **Depends on**: 1
- **Status**: not_started
- **Status**: planned (P1 verify flagged P1-3 single-slot mock store + P1-4 run-view test gaps → addressed here)
### Phase 3 — v2 Surface Mockups + Polish + 3-Click Validation
- **Description**: Project graph and task inbox panels as visual mockups (v2 vision validation); typography care pass (reader experience per vision §4); ≤3-click happy-path validation on defaults.