docs(P05): phase 5 shipped — checkpoint advances to phase 6 (final)
---ci---
phase: 5
milestone: v0.1
status: complete
requirements:
covered: [REQ-63, REQ-64, REQ-65, REQ-66]
partial: []
---ci---
Ship record: PR #5 squash-merged phase/05-app-shell-reports-settings →
milestone/v0.1-prototype (b44bffc), tag v0.1.5, phase branch deleted
(local+remote), Gitea release v0.1.5 created (HTTP 201). REQUIREMENTS
traceability REQ-63..66 → complete; ROADMAP P5 → complete, P6 → next.
P6 re-presents the extended prototype at the REQ-62 owner approval
gate: review the full milestone diff, audit, tag v0.1.6, halt for
the owner's recorded decision.
This commit is contained in:
@@ -1,8 +1,8 @@
|
||||
{
|
||||
"phase": 5,
|
||||
"phase": 6,
|
||||
"stage": "execute",
|
||||
"milestone": "v0.1",
|
||||
"phase_role": "execution",
|
||||
"phase_role": "final",
|
||||
"attempts": 0,
|
||||
"updated_at": "2026-09-27T03:05:00Z"
|
||||
"updated_at": "2026-09-27T03:30:00Z"
|
||||
}
|
||||
|
||||
@@ -116,7 +116,7 @@
|
||||
| REQ-58, REQ-59 (Reading Room, exports) | v0.1 | P2 | complete |
|
||||
| REQ-60, REQ-61 (v2 mockups, 3-click) | v0.1 | P3 | complete |
|
||||
| REQ-62 (approval gate) | v0.1 | P6 | in_progress (awaiting owner decision on extended prototype) |
|
||||
| REQ-63, REQ-64, REQ-65, REQ-66 (app shell, library, settings, avatar) | v0.1 | P5 | in_progress |
|
||||
| REQ-63, REQ-64, REQ-65, REQ-66 (app shell, library, settings, avatar) | v0.1 | P5 | complete |
|
||||
| REQ-01..06, REQ-08..11, REQ-31 (framework, adapters) | v0.2 | P1 | blocked |
|
||||
| REQ-07, REQ-12, REQ-13..24 (probing, engine, trust) | v0.2 | P2 | blocked |
|
||||
| REQ-25, REQ-26, REQ-33 (API, client, tooling) | v0.2 | P3 | blocked |
|
||||
|
||||
+3
-3
@@ -40,12 +40,12 @@ Two milestones, owner-directed 2026-09-27. **Milestone v0.1 — Prototype**: the
|
||||
- **Depends on**: 3
|
||||
- **Status**: shipped (PR #4 squash-merged, tag v0.1.4 + release created; review 5 P0s fixed; audit PASS; owner returned gate feedback instead of approve/reject → binding extension cycle P5/P6 before the merge to main)
|
||||
|
||||
### Phase 5 — App Shell + Research Library + Settings + Avatar (owner gate feedback)
|
||||
- **Description**: Persistent app shell on every screen: sidebar (nav + future-option slots: connection status, methodology defaults preview) + top bar (⌘K navigation palette slot + avatar button with user menu). Research library upgraded: folder-structure report storage with auto-categorization, sorting, and cross-report connection drawing in the project graph. Settings screen: API keys (masked), storage endpoint, methodology defaults, appearance slot, about/version. All data through the ApiClient boundary (mock-backed); zero added clicks to the ≤3-click happy path.
|
||||
### Phase 5 — App Shell + Research Library + Settings + Avatar (complete — shipped v0.1.5)
|
||||
- **Description**: Persistent app shell on every screen: sidebar (nav + future-option slots: connection status, methodology-defaults preview) + top bar (⌘K navigation palette slot + avatar button with user menu). Research library upgraded: folder-structure report storage with auto-categorization, sorting, and cross-report connection drawing in the project graph. Settings screen: API keys (masked), storage endpoint, methodology defaults, appearance slot, about/version. All data through the ApiClient boundary (mock-backed); zero added clicks to the ≤3-click happy path.
|
||||
- **Requirements covered**: REQ-63, REQ-64, REQ-65, REQ-66
|
||||
- **Success criteria**: shell renders on all screens with sidebar + top bar + avatar menu; library shows folder tree + sortable report cards + cross-report graph edges; settings sections all functional on mock data; 3-click path pinned green post-shell; gates green
|
||||
- **Depends on**: 4
|
||||
- **Status**: in_progress
|
||||
- **Status**: complete (PR #5 squash-merged to milestone/v0.1-prototype, tag v0.1.5, release created; verify PASS with one P1 fixed in-phase — main landmark restored)
|
||||
|
||||
### Phase 6 — Final Review + Approval Re-presentation + Ship (FINAL)
|
||||
- **Description**: Multi-persona review of the full milestone diff (now including P5), audit, then re-present the **extended prototype** at the REQ-62 owner approval gate. On recorded approval: milestone merge to main, tag v0.1.6 — the milestone release. (v0.2 P1 branches only after this tag.)
|
||||
|
||||