docs(P08): final phase shipped — v0.1.8-uat staged; pipeline halts at approval gate

---ci---
phase: 8
milestone: v0.1
status: approval_pending
escalation:
  type: prototype_approval
  hook: prototype_approval
  resolution: pending_owner_decision
  message: >-
    v0.1.8 milestone release candidate shipped and presented. UAT
    staged per owner cadence (v0.1.7-uat mid-cycle, v0.1.8-uat at
    gate). On recorded approval: milestone merge to main, milestone
    branches deleted, v0.2 unblocked. On rejection: feedback becomes
    binding decisions for a fix cycle.
requirements:
  covered: [REQ-52, REQ-53, REQ-54, REQ-55, REQ-56, REQ-57, REQ-58, REQ-59, REQ-60, REQ-61, REQ-63, REQ-64, REQ-65, REQ-66, REQ-67, REQ-68]
  partial: [REQ-62]
---/ci---

Ship record: PR #8 squash-merged phase/08-final-review-approval-ship →
milestone/v0.1-prototype (93a7b57), tag v0.1.8, phase branch deleted
(local+remote), Gitea release v0.1.8 created (HTTP 201), v0.1.8-uat
deployed healthy to the LXC host (gates re-run at deploy time, all
routes 200, suggestions + refine affordances served). DEPLOY-RECORD
row added; ROADMAP P8 → complete-pending-approval. Checkpoint stays
approval_pending at the REQ-62 gate — the milestone merge to main
awaits the owner's recorded decision.
This commit is contained in:
coreci
2026-09-27 05:30:28 +00:00
parent 93a7b5755c
commit 57c5231d88
2 changed files with 4 additions and 3 deletions
+2 -2
View File
@@ -61,12 +61,12 @@ Two milestones, owner-directed 2026-09-27. **Milestone v0.1 — Prototype**: the
- **Depends on**: 6
- **Status**: complete (PR #7 squash-merged to milestone/v0.1-prototype, tag v0.1.7, release created; verify PASS — 2 P1 fixes with regression tests: Enter-guard defense in depth, focus return to trigger)
### Phase 8 — Final Review + Approval Re-presentation + Ship (FINAL)
### Phase 8 — Final Review + Approval Re-presentation + Ship (FINAL — shipped, gate open)
- **Description**: Multi-persona review of the full milestone diff (now including P7), audit, then re-present the extended prototype at the REQ-62 owner approval gate. On recorded approval: milestone merge to main, tag v0.1.8 — the milestone release. (v0.2 P1 branches only after this tag.)
- **Requirements covered**: REQ-62 (gate) + milestone approval of REQ-52..68
- **Success criteria**: review PASS (P0s fixed in-phase); audit PASS; v0.1.8 tagged + release; UAT staged per owner directive; pipeline halts at the approval gate
- **Depends on**: 7
- **Status**: in_progress
- **Status**: complete-pending-approval (PR #8 squash-merged, tag v0.1.8 + release created; review PASS-WITH-FIXES — double-compose + drawer-keyboard P1s fixed, 90/90; audit PASS-WITH-NOTES, all notes applied; v0.1.7-uat + v0.1.8-uat staged per owner cadence; milestone merge to main HALTED at the REQ-62 owner approval gate)
## Milestone v0.2 — MVP (feature) — BLOCKED until prototype approval
+2 -1
View File
@@ -8,7 +8,8 @@ without minting release tags.
|---|---|---|---|---|
| 2026-09-27 | v0.1.4-uat | d15568f (P3 ship) | owner review staging (P4) | healthy — http://10.0.0.114:3000 |
| 2026-09-27 | v0.1.6-uat | 600b49c (P6 ship) | owner: "push updates to lxc container" | healthy — http://10.0.0.114:3000 |
| 2026-09-27 | v0.1.7-uat | 432d2c0 (milestone HEAD, P7 + boundary docs) | owner cadence: deploy after P7 and P8 | healthy — http://10.0.0.114:3000 |
| 2026-09-27 | v0.1.7-uat | 432d2c0 (P7 ship + boundary docs) | owner cadence: deploy after P7 and P8 | healthy — http://10.0.0.114:3000 |
| 2026-09-27 | v0.1.8-uat | 93a7b57 (P8 ship — milestone release candidate) | owner cadence: deploy after P7 and P8 | healthy — http://10.0.0.114:3000 |
## v0.1.6-uat (extended prototype for owner review)