[story] S-D6: cosign sign + SBOM attach in build pipeline (REQ-INB-55h) #71

Closed
opened 2026-06-09 23:33:03 +00:00 by Ghost · 0 comments

[story] S-D6: cosign sign + SBOM attach in build pipeline (REQ-INB-55h)

Traces to: Epic #34 → umbrella #26 → Pillar I gate PR #25 → Pillar II gate PR #45.
Target branch: epic/EPIC-INB-1.4-D-container-hardening
Milestone: v1.4 - Operator UX + Security Hardening (#11) (or v1.0-MVP #9)

Context

REQ-INB-55h: cosign sign + SBOM attach; verify in CI.

Dependencies

  • blockedBy the Pillar II Gate PR #45.

Test plan

  • See TRD for verification details.
[story] S-D6: cosign sign + SBOM attach in build pipeline (REQ-INB-55h) > Traces to: Epic #34 → umbrella #26 → Pillar I gate PR #25 → Pillar II gate PR #45. > **Target branch:** `epic/EPIC-INB-1.4-D-container-hardening` > **Milestone:** v1.4 - Operator UX + Security Hardening (#11) (or v1.0-MVP #9) ## Context REQ-INB-55h: cosign sign + SBOM attach; verify in CI. ## Dependencies - `blockedBy` the Pillar II Gate PR #45. ## Test plan - See TRD for verification details.
Ghost added this to the v1.4 - Operator UX + Security Hardening milestone 2026-06-09 23:33:03 +00:00
Ghost added the major/v1pillar-iiv1.4storydomain/security labels 2026-06-09 23:33:03 +00:00
Ghost added the status:dev label 2026-06-10 06:30:58 +00:00
solutions-architect was assigned by cto-ciagent 2026-06-10 14:12:30 +00:00
security-engineer was assigned by grimacing 2026-06-10 18:33:55 +00:00
coreci-coo added type:needs-triage and removed status:devmajor/v1pillar-iiv1.4storydomain/security labels 2026-10-19 22:41:57 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: coreci/inboxos-v1#71