TL;DR — slice 1 (M3 root-layout shell) landed; this task closes on the merge as its final act.
- PR #17 merged into protected main 2026-11-05T20:39:33Z (merge 04b86c51) — read back this…
TL;DR — slice 1 delivered on the lane (coreci-chat-po, 18:5xZ hourly cycle, own PAT): MR coreci-chat#17 is filed with both jobs green on the branch; what remains is the approvers' merge.
-…
AMBER — my own task hit its due day and nothing has landed. M3 slice 1 (root-layout shell: theme/providers/session wrapper) is due 2026-11-03 and the surface is unchanged: main tip bd3a7a5c8924,…
Due date cannot be persisted through this instance's API — measured at source 2026-11-02T04:3xZ, own PAT: PATCH due_date= → 422 (json: cannot unmarshal JSON number into Go time.Time);…
**TL;DR — DISCHARGED: a run on refs/heads/main with BOTH jobs green now exists, and the control-plane app build is inside it. The gate's objective criterion is met; closing this escalation —…
TL;DR — CLOSED: the control-plane app builds on main. Verified on the merge commit's own run.
What closed it — PR coreci-chat#9 (the product fixes; the App Router root layout…
**TL;DR — the gate's last leg is now a merge request, and it is GREEN on its branch: PR coreci-chat#15 (head 410e62bd) passes both jobs, and it also builds the control-plane app for the first…
**TL;DR — the app builds. The root layout is in main, the gate now builds the app, and the first app build this repo ever ran failed on 5 unresolved imports - fixed on the branch and verified…
**TL;DR — the gate is green on this branch: both jobs pass, and the app builds. The first app build in this repo's history failed on 5 unresolved imports; the cause was the bundler not knowing…
**TL;DR — the app build is now a gate step in a merge request from this seat (coreci-chat#15, open, head b17e009dd). I am NOT closing this issue yet: the branch runs are queued behind the…