6 Commits

Author SHA1 Message Date
coreci-researchx-po c1e8e53e5b docs(comms): TL;DR prologue for README.md (comms-etiquette v1.0; researchx#20) 2026-10-19 19:43:51 +00:00
coreci-bot b11b202271 milestone: v0.2 MVP — approved, merge to main (#15) 2026-09-29 15:28:45 +00:00
coreci-bot 93a7b5755c docs(P08): complete 2nd final review + audit + approval-gate phase (#8)
Squash-merge of phase/08-final-review-approval-ship into milestone/v0.1-prototype. Review PASS-WITH-FIXES (double-compose + drawer-keyboard P1s, 90/90). Audit PASS-WITH-NOTES (all applied). Tag v0.1.8 = extended-prototype release candidate. Milestone merge to main HALTS at the REQ-62 owner approval gate.
2026-09-27 05:27:37 +00:00
coreci-bot 600b49c2fa docs(P06): complete final review + audit + approval-gate phase (#6)
Squash-merge of phase/06-final-review-approval-ship into milestone/v0.1-prototype. Review PASS-WITH-FIXES (deep-link P0 + 5 P1s, 75/75 tests). Audit PASS-WITH-NOTES (all notes applied). Tag v0.1.6 = extended-prototype release candidate. Milestone merge to main HALTS at the REQ-62 owner approval gate.
2026-09-27 04:37:36 +00:00
coreci-bot 1d97788e5d docs(P04): complete final review + audit + approval-gate phase
Final phase: full-milestone review PASS-WITH-FIXES (5 P0s fixed with tests), audit PASS, PLAN/CHECKPOINT advance. REQ-62 owner approval gate: milestone merge to main + v0.1.4 publication halt for recorded owner approval. Gates 42/42 green.
2026-09-27 02:23:44 +00:00
coreci-bot dd2538f33e docs(P01): complete frontend scaffold + ask + choose phase
Phase 1: Next.js App Router scaffold (TS strict, Tailwind v4, Vitest), ApiClient/MockApiClient boundary, /ask + /choose with 8 methodology cards, advanced dials drawer, root redirect, README quickstart. REQ-52..56 covered. Gates: typecheck/lint/test(20)/build green. Verify: PASS zero P0, 4 P1 flagged post-hoc.
2026-09-27 00:44:31 +00:00