Commit Graph

5 Commits

Author SHA1 Message Date
Praxis CI f0e718f16a docs(milestone): merge phase/02 final-review-ship → milestone/v0.3-mastery-scoring
Final phase complete. Review: APPROVE_WITH_NOTES. Audit: HEALTHY.
v0.3 milestone ready for release as v0.1.5.

---ci---
project: praxis
phase: 2
milestone: v0.3
status: complete
---/ci---
2026-08-04 00:14:56 +00:00
Praxis CI dc673e5e3d docs(milestone): merge phase/00 pre-execution → milestone/v0.3-mastery-scoring
Phase 0 complete. v0.3 mastery-scoring planning artifacts shipped.
Pipeline: SPECIFY → CLARIFY → RESEARCH → PLAN → GRILL.
13 REQ-IDs active (7 functional + 6 NFR); 8 deferred to v0.4 (operator tier).
Decisions D-031..D-049 (19 total, all >=0.70 confidence).
4 MUST grill conditions resolved, 5 FIX tracked.

---ci---
project: praxis
phase: 0
milestone: v0.3
status: complete
requirements:
  covered: [REQ-MAST-01, REQ-MAST-02, REQ-MAST-03, REQ-SCEN-02, REQ-SCEN-03, REQ-SCEN-04, REQ-PATH-02]
  partial: []
---/ci---
2026-08-03 19:58:38 +00:00
Praxis CI 1b3617da3b docs(P02): review + audit — APPROVE_WITH_NOTES, HEALTHY, 2 P0 fixed
REVIEW.md: 2 P0 fixed (stale test defaults, sandbox isolation),
  8 P1+ flagged for post-hoc review. Verdict: APPROVE_WITH_NOTES.
AUDIT.md: 0 critical, 5 warnings. Reconstruction PASS, file
  discipline PASS, branch hygiene PASS, commit discipline PASS.
  Verdict: HEALTHY. Doc-drift fixed (REQ statuses → complete).

P0 fixes in working tree:
  1. lxc-config.bats: aligned stale defaults with production code
  2. lxc-deploy.bats: fixed sandbox isolation (HOME redirect)

---ci---
project: praxis
phase: 2
milestone: v0.2
status: review
---/ci---
2026-08-03 18:54:38 +00:00
Praxis CI 70994e18ad docs(init): validate specification — v0.2 Proxmox LXC deployment
---ci---
project: praxis
phase: 0
milestone: v0.2
status: specify
---/ci---
2026-08-01 13:51:29 +00:00
Praxis CI fbd6602814 docs(milestone): complete v0.1 foundation
---ci---
phase: 0
milestone: v0.1
status: complete
---/ci---
2026-08-01 13:32:48 +00:00