Commit Graph

5 Commits

Author SHA1 Message Date
Praxis CI 813bd586d6 docs(milestone): merge v0.3-mastery-scoring → main
v0.3 milestone merged to main. Mastery scoring + competency rubrics +
verifiable credentials (formative-tier) shipped. 13/13 REQ-IDs covered.
Next milestone: v0.4 (operator tier — cohort dashboard + auth + Postgres).

---ci---
project: praxis
phase: 2
milestone: v0.3
status: complete
milestone_complete: true
milestone_merged_to_main: true
---/ci---
2026-08-04 00:14:59 +00:00
Praxis CI 1b3617da3b docs(P02): review + audit — APPROVE_WITH_NOTES, HEALTHY, 2 P0 fixed
REVIEW.md: 2 P0 fixed (stale test defaults, sandbox isolation),
  8 P1+ flagged for post-hoc review. Verdict: APPROVE_WITH_NOTES.
AUDIT.md: 0 critical, 5 warnings. Reconstruction PASS, file
  discipline PASS, branch hygiene PASS, commit discipline PASS.
  Verdict: HEALTHY. Doc-drift fixed (REQ statuses → complete).

P0 fixes in working tree:
  1. lxc-config.bats: aligned stale defaults with production code
  2. lxc-deploy.bats: fixed sandbox isolation (HOME redirect)

---ci---
project: praxis
phase: 2
milestone: v0.2
status: review
---/ci---
2026-08-03 18:54:38 +00:00
Praxis CI 6cf63cb064 docs(P01): verify — APPROVE_WITH_NOTES, 4 P0 fixed, 18/20 REQ covered
Verification layers:
  Structural: PASS (all scripts executable, syntax clean, Dockerfile valid)
  Behavioral: PASS (121 bats, 77 pytest, docker build succeeds, compose valid)
  Security: PASS (no secrets committed, .dockerignore excludes .env*, env_file pattern)
  Quality: PASS (coreci patterns followed, no coreci refs, G-104/G-105/G-106 verified)

P0 issues found and auto-fixed:
  1. docker-compose.yml: removed invalid restart_policy key, fixed env_file syntax
  2. pyproject.toml: added fastapi + uvicorn deps (v0.1 gap exposed by Dockerfile)
  3. timing.sh: renamed coreci_deploy_timing → praxis_deploy_timing (TASK-03-07)
  4. firstboot-hook.sh: fixed idempotency check (/opt/praxis/.git not /usr/local/bin/praxis-deploy)

P1+ issues: 8 (1 fixed: lxc-config.sh default alignment, 7 noted for post-hoc review)
REQ coverage: 18/20 covered, 2 deferred (live first-boot timing + live E2E require cluster)
Must-haves: 25/28 pass, 2 partial (comment-only diffs, no Makefile), 1 deferred

---ci---
project: praxis
phase: 1
milestone: v0.2
status: verify
---/ci---
2026-08-03 18:37:45 +00:00
Praxis CI 70994e18ad docs(init): validate specification — v0.2 Proxmox LXC deployment
---ci---
project: praxis
phase: 0
milestone: v0.2
status: specify
---/ci---
2026-08-01 13:51:29 +00:00
Praxis CI fbd6602814 docs(milestone): complete v0.1 foundation
---ci---
phase: 0
milestone: v0.1
status: complete
---/ci---
2026-08-01 13:32:48 +00:00