5b99bbd2e8
PLAN stage: 8-wave structure covering 23 phases. Wave 0 (P00 cache), Wave 1 (P01/P01.5/P02 observability+identity), Wave 2 (P03/P15.5 security+ingress hybrid+doctor mTLS), Wave 3 (P04/P06 backup+alloc history+logs), Wave 4 (P05/P07 drain+migrate+recovery), Wave 5 (P10/P11/P12 txn plane+drift+lint+verify), Wave 6 (P09/P13 aggregator+ns), Wave 7 (P14a/b/c migration+upgrade+rotate-lead), Wave 8 (P08/P15/P16 integration+docs+ship). P10 is the largest phase; grill may split into P10a/P10b. ---ci--- project: orca phase: 0 milestone: v0.11 status: plan ---/ci---
14 lines
368 B
JSON
14 lines
368 B
JSON
{
|
|
"phase": 0,
|
|
"stage": "plan",
|
|
"milestone": "v0.11",
|
|
"milestone_slug": "production-hardening",
|
|
"phase_role": "pre_execution",
|
|
"attempts": 0,
|
|
"updated_at": "2026-08-07T00:03:00Z",
|
|
"milestone_complete": false,
|
|
"previous_milestone": "v0.10",
|
|
"research_docs_ingested": 5,
|
|
"locked_decisions": {"Q1": "A", "Q2": "C", "Q3": "A", "Q4": "A", "Q5": "A"}
|
|
}
|