Jon Chery 5b99bbd2e8 docs(P00): create v0.11 phase plan (8 waves, 23 phases, 20 new REQs)
PLAN stage: 8-wave structure covering 23 phases. Wave 0 (P00 cache), Wave 1 (P01/P01.5/P02 observability+identity), Wave 2 (P03/P15.5 security+ingress hybrid+doctor mTLS), Wave 3 (P04/P06 backup+alloc history+logs), Wave 4 (P05/P07 drain+migrate+recovery), Wave 5 (P10/P11/P12 txn plane+drift+lint+verify), Wave 6 (P09/P13 aggregator+ns), Wave 7 (P14a/b/c migration+upgrade+rotate-lead), Wave 8 (P08/P15/P16 integration+docs+ship). P10 is the largest phase; grill may split into P10a/P10b.

---ci---
project: orca
phase: 0
milestone: v0.11
status: plan
---/ci---
2026-08-07 03:39:27 +00:00

14 lines
368 B
JSON

{
"phase": 0,
"stage": "plan",
"milestone": "v0.11",
"milestone_slug": "production-hardening",
"phase_role": "pre_execution",
"attempts": 0,
"updated_at": "2026-08-07T00:03:00Z",
"milestone_complete": false,
"previous_milestone": "v0.10",
"research_docs_ingested": 5,
"locked_decisions": {"Q1": "A", "Q2": "C", "Q3": "A", "Q4": "A", "Q5": "A"}
}