Jon Chery 3551b37ac0 docs(P00): grill + plan revision — v0.14 binding conditions
Grill verdict: RETHINK (0.45) → revised plan addresses all 12
binding conditions (C-50..C-61):
- C-50: install podman if absent (linux/lead)
- C-51: DNATTarget validation (nft injection guard)
- C-53: apt-get idempotency (command -v podman check)
- C-54: offline-first tension documented (podman pull exception)
- C-55: native-mode nft single-apply (discover LXC IP first)
- C-56: MAC collision check against registry
- C-57: v0.13→v0.14 upgrade path (remove legacy systemd+binary)
- C-58: mount static config from host (preserve REQ-100 opt-out)
- C-59: migration 0009 (not 0007)
- C-60: certpaths.CACertPath() (not CAPath())
- C-61: --restart=unless-stopped, omit :Z
- C-62/G-003: mTLS deferred to v0.15 (confidence 0.55 < 0.60)

---ci---
project: orca
phase: 0
milestone: v0.14
status: grill
---/ci---
2026-08-10 18:26:33 +00:00
Jon Chery 5e0b899f1a docs(init): validate specification — v0.14 ingress bootstrap
---ci---
project: orca
phase: 0
milestone: v0.14
status: specify
---/ci---
2026-08-10 18:07:55 +00:00
Jon Chery c0ba30824e chore(P13): final review + audit — v0.13 milestone complete
All 15 v0.13 requirements (REQ-149..REQ-163) marked complete.
All 14 phases shipped (P0..P13, tags v0.12.0..v0.12.12).
163 requirements consistent with roadmap (verify-reqs passes).
ROADMAP.md marks v0.13 COMPLETE.
All Go tests pass. Build clean.

Milestone deliverables:
- R-022: orca job run deploys to remote nodes via scheduler+emitter+SSH-push
- R-023: zero-trust enforcement wired (acl.Check on every request path)
- 11 injection vectors fixed
- Go toolchain bumped to 1.25.12 (24 stdlib vulns closed)
- Audit chain race fixed (BEGIN IMMEDIATE)
- Concurrency safety (SQLite busy_timeout, flock, cache invalidation)
- Transport safety (typed errors, IPv6, SSH timeouts, signal handler)
- Migration safety (job stop real systemctl, backup+atomic-rename)
- Observability (7 new metrics, security headers)
- Doc drift fixed (README, cli.md, CHANGELOG, verify-reqs regex)
- --type linux SSH-join for Ubuntu workers
- docs/uat.md (3-host topology, 35-claim matrix)
- scripts/uat-signoff.sh (35 assertions, idempotent, v1.0 gate)
- scripts/uat-smoke.sh (13 CI assertions)

v1.0.0 production-ready tag stays deferred for UAT signoff.
Operator runs scripts/uat-signoff.sh, pastes output, CI agent cuts v1.0.0.

---ci---
project: orca
phase: 13
milestone: v0.13
status: complete
requirements:
  covered: [149,150,151,152,153,154,155,156,157,158,159,160,161,162,163]
---/ci---
2026-08-10 14:37:33 +00:00
Jon Chery b6dd86fdf3 docs(P11): doc drift round 2 — README, cli.md, CHANGELOG, verify-reqs (REQ-160)
- README: status banner v0.12+v0.13, latest tag v0.12.10, subcommand
  table expanded (auth/nft/peer-setup/secrets rotate-master), "mTLS by
  default" corrected to "SSH-push canonical", docs table updated
- docs/cli.md: complete rewrite (521->1465 lines), all ~40 subcommands
- CHANGELOG: regenerated from git log (v0.11.29..HEAD)
- help text: job run HCL->markdown, job stop daemon->SSH-push
- docs/security-runbook.md: expanded to match P05 reality (seal/unseal,
  doctor audit/modes/oidc, incident response)
- docs/webauthn.md: added auth register (P06)
- docs/namespace.md: added inherit + set-constraint
- internal/proxmox/bootstrap.go: comments password->key auth
- internal/cli/status.go: deprecation warning
- scripts/verify-docs.sh + make verify-docs: cli.md <-> orca --help
- cmd/verify-reqs/main.go: fix bold-format regex (was bypassing v0.12)
  + case-insensitive status matching
- .ciagent/REQUIREMENTS.md: v0.12 REQs marked complete
- .ciagent/ROADMAP.md: v0.12 bolded COMPLETE

---ci---
project: orca
phase: 11
milestone: v0.13
status: complete
requirements:
  covered: [160]
---/ci---
2026-08-10 14:18:27 +00:00
Jon Chery 8071793260 docs(init): validate specification — v0.13 Production Hardening Round 2 + UAT Plan
15 new requirements (REQ-149..REQ-163), 14 phases (P0+P01..P12+P13).
Three deep codebase sweeps surfaced ~60 gaps beyond v0.12:
- orca job run runs locally (scheduler/emitter/SSH-push dead code)
- jobspec schedule/timeout silently dropped (DaemonSet broken)
- acl.Check called zero times (v0.12 zero-trust not wired)
- command injection vectors (logs --job, tar-slip, sudoers, txn rollback)
- Go toolchain 1.25.0 (24 stdlib vulns)
- concurrency hazards (audit chain race, secrets data loss, no busy_timeout)
- cache never invalidated by writes
- massive doc drift (README mTLS claim false, cli.md missing 25 subcommands)

v1.0.0 stays deferred for post-v0.13 UAT signoff.

---ci---
project: orca
phase: 0
milestone: v0.13
status: specify
---/ci---
2026-08-07 18:43:04 +00:00
Jon Chery cf0df0f157 docs(P00): v0.12 security-hardening phase 0 (specify/clarify/research/ideate/plan/grill)
---ci---
project: orca
phase: 0
milestone: v0.12
status: specify
---/ci---

Threat-model review of entire surface incl OS (25 findings F1..F25).
Adopts R-021 (no Orca credentials: human=OIDC, machine=mTLS/SPIFFE).
Bundled Dex + WebAuthn (passkeys) as default password-free authenticator.
Master key seal-to-OIDC + Shamir 3-of-5 recovery.
30 net-new requirements (REQ-119..REQ-148). 29 phases. Binding conditions C-29..C-38.
2026-08-07 10:45:07 +00:00
Jon Chery da1f93ea77 docs(milestone): complete v0.11 — Production Hardening (24 phases shipped)
Mark all v0.11 REQs (REQ-099..118 + deferred REQ-061/065/066/075/079/080/084/086/087) as Complete in REQUIREMENTS.md. Mark all v0.11 phases as [x] and the milestone as COMPLETE in ROADMAP.md. Update checkpoint to phase 16/complete/milestone_complete=true.

v0.11 shipped 24 phases (P00..P16 including P10a/P10b split per C-24):
- P00: CLI cache (R-008)
- P01: Metrics endpoint
- P01.5: SPIFFE SVID spike (C-08 PASSED)
- P02: ACL (SPIFFE + token)
- P03: Secrets (AES-256-GCM, REQ-080)
- P04: Backup/restore (signed tarball)
- P05: Drain + daemon drain-and-stop (REQ-061) + job migrate (REQ-116)
- P06: Alloc history (REQ-071) + logs --all-nodes (REQ-117)
- P07: Recovery (orca restore)
- P08: Integration tests (REQ-087) + drift stubs
- P09: Collector + aggregator (C-11/C-12/C-14) + drift aggregation (REQ-107)
- P10a: Transactional plane (REQ-075/079, C-09, C-23)
- P10b: Drift detection (R-018/R-019/R-020, REQ-103..113)
- P11: Job lint (REQ-084)
- P12: Job verify (dry-run txn)
- P13: ns subcommands + deprecation warnings (REQ-068)
- P14a: v0.8→v1.0 migration (REQ-066, C-07) + upgrade (REQ-115, C-25, C-27)
- P14b: Daemon cutover + rotate-lead (REQ-114)
- P14c: Mixed-version tolerance + no-orca-on-server (REQ-065, REQ-086, C-13)
- P15: README quickstart (REQ-089, Q5=A framing)
- P15.5: Threat model (C-19) + ingress hybrid (R-017, REQ-099..102) + doctor mTLS (REQ-118)
- P16: Final review + ship + audit (this phase)

Tags: v0.10.0 (P0) → v0.10.22 (P16 = v0.11.0 milestone release).
Total: 118 REQs (98 prior + 20 new), all Complete.

---ci---
project: orca
phase: 16
milestone: v0.11
status: complete
requirements:
  covered: [99,100,101,102,103,104,105,106,107,108,109,110,111,112,113,114,115,116,117,118,61,65,66,75,79,80,84,86,87]
  partial: []
gates:
  cleared: [C-23,C-24,C-25,C-27,C-28,C-08,C-09,C-11,C-12,C-14,C-19]
---/ci---
2026-08-07 08:36:29 +00:00
Jon Chery 715fcb54b3 fix(verify-reqs): update 9 deferred REQ phase cells from v0.10 to v0.11
REQ-061, 065, 066, 075, 079, 080, 084, 086, 087 were assigned v0.10 Pxx phases in v0.9 planning but v0.10 became a docs milestone; these execution REQs are now v0.11. Phase cells updated to reference v0.11 Pxx phases so verify-reqs passes (forward drift: milestone COMPLETE in ROADMAP must have REQ Complete; these were Pending with a COMPLETE milestone reference).

---ci---
project: orca
phase: 0
milestone: v0.11
status: grill
---/ci---
2026-08-07 03:43:52 +00:00
Jon Chery 1cc965e23b docs(specify): adopt R-017..R-020, D-215..D-237, REQ-099..REQ-118 for v0.11
SPECIFY stage: adopt 5 research docs into authoritative ciagent files.
- PRD_v0.11.md: new file extending R-series 16->20 (R-017 ingress hybrid, R-018/R-019/R-020 drift detection)
- PROJECT.md: append D-215..D-237 (23 new decisions, no collisions with D-001..D-206)
- REQUIREMENTS.md: append REQ-099..REQ-118 (20 net-new; ingress 099-102, drift 103-113, CLI 114-118)
- ROADMAP.md: update v0.11 section (fold ingress into P15.5 per Q3=A, expand P09/P10, add CLI REQs to P05/P06/P14a/P14b per Q2=C)

---ci---
project: orca
phase: 0
milestone: v0.11
status: specify
---/ci---
2026-08-07 03:37:24 +00:00
Jon Chery f0b9910bf1 docs(milestone): complete v0.10 — docs & install hardening
Milestone v0.10 — Docs & Install Hardening — COMPLETE.

6 tagged phases (v0.9.0..v0.9.5). 8 REQs (091-098) all Complete:
- REQ-091: docs/cli.md (CLI reference)
- REQ-092: docs/jobspec.md (jobspec reference)
- REQ-093: docs/ingress.md (ingress guide)
- REQ-094: examples/full-stack/ (5 jobspecs + rendered + walkthrough)
- REQ-095: README.md refresh (22 commands, current install, docs/examples)
- REQ-096: docs/namespace.md v0.9 multi-namespace layout
- REQ-097: release.sh cross-build amd64 + asset verification (C-21)
- REQ-098: install.sh fallback walk + --check dry-run

3 binding conditions cleared (C-20, C-21, C-22).
7 decisions (D-188..D-194). 31 files changed, 2654 insertions.

Root cause of v0.4.5 install fixed: v0.8.x releases shipped with zero
binary assets; release.sh now cross-builds amd64 + verifies the asset
post-create; install.sh walks back through releases if the latest lacks
an asset. v0.9.1 is the first correctly-asseted release.

---ci---
project: orca
phase: 5
milestone: v0.10
status: complete
requirements:
  covered: [REQ-091,REQ-092,REQ-093,REQ-094,REQ-095,REQ-096,REQ-097,REQ-098]
  partial: []
---/ci---
2026-08-05 21:02:31 +00:00
Jon Chery fe8851b161 docs(init): validate v0.10 specification — docs/cli-examples milestone
---ci---
project: orca
phase: 0
milestone: v0.10
status: specify
---/ci---
2026-08-05 20:45:26 +00:00
Jon Chery c51eba5e84 fix(P99): P0 heredoc command injection + ROADMAP/REQUIREMENTS reconciliation
P0 fix (final review T1): internal/sshpush/idempotency.go heredoc
command injection via fixed EOF delimiter. Replaced with per-write random
delimiter verified absent from content (strings.Contains check). Fake SSH
server updated to parse the delimiter dynamically from the command. This
prevents command injection via crafted file content in multi-tenant
namespaces.

ROADMAP reconciliation (final review T2.1): updated v0.9 phase list to
reflect actual execution — 14 tagged phases (P03/P04/P08 combined,
P07a/b/c combined), tags v0.8.1..v0.8.14. Milestone marked COMPLETE.
Phase checkboxes marked [x] with actual REQs covered.

REQUIREMENTS reconciliation: 21 v0.9-scoped REQs marked Complete
(062,063,064,067,068,069,070,071,072,073,074,076,077,078,081,082,
083,085,088,089,090). 9 v0.10-deferred REQs (061,065,066,075,079,
080,084,086,087) Phase columns fixed to reference only v0.10 (not v0.9/v0.8)
so verify-reqs doesn't flag them as belonging to completed milestones.

Final review: P0 fixed. P1 warnings logged for post-hoc v0.10: fuzz in CI,
podman command quoting, scheduler O(n^2), ProcessRuntime stdout leak,
host-key verification path gap. 12/19 grill gates cleared; 7 deferred to
v0.10 (C-08,C-09,C-11,C-12,C-13,C-19).

26 packages pass, 20 bats pass, gofmt clean, verify-reqs 90 consistent.

---ci---
project: orca
phase: 99
milestone: v0.9
status: execute
---/ci---
2026-08-05 19:02:54 +00:00
Jon Chery 40b5e781ce docs(P00): resolve C-04 — relabel v1.0→v0.10 milestone, keep all 40 phases, v1.0 UAT-gated
Operator decision (resolves grill C-04 + escalation E-03): keep 2 milestones
(v0.9 + v0.10), keep all phases (40 total, exceeds 35 soft limit), v1.0 is
UAT-gated and cut as a separate tag (v1.0.0) after v0.10 completion per
operator sign-off — not a separate milestone.

Relabels all v1.0 milestone references to v0.10 across ROADMAP, REQUIREMENTS,
GRILL_v0.9, IDEATION_v0.9, PRD_v0.9, PROJECT. Phase content unchanged; only
the milestone label moves. Historical grill narrative (the original PRD §23
counts and the E-03 auto-split reasoning) preserved verbatim for audit
integrity. C-04 and E-03 marked RESOLVED in GRILL_v0.9.md.

Milestone structure:
- v0.9: Re-architecture Foundation & Workloads (13 phases P00..P0X)
- v0.10: Production Hardening (19 phases P00..P16, milestone tag v0.10.0)
- v1.0: UAT-gated production-ready cut (separate v1.0.0 tag, not a milestone)

verify-reqs: 90 requirements consistent.

---ci---
project: orca
phase: 0
milestone: v0.9
status: complete
gate: C-04 resolved
---/ci---
2026-08-05 16:08:33 +00:00
Jon Chery e008c53966 docs(P00): specify v0.9 re-architecture milestone — PRD adopted, REQ-061..090, supersession table
Adopts the v0.9/v1.0 PRD (.ciagent/PRD_v0.9.md) that supersedes the shipped
v0.1-v0.8 architecture. The re-architecture is justified by a six-part
evidence basis recorded in the PROJECT.md Supersession Table:
operational daemon failure, external step-ca mandate, multi-tenancy
requirement, WASM workload requirement, SSH-push deployment target,
and vision correction.

Appends 30 net-new requirements (REQ-061..REQ-090) to REQUIREMENTS.md,
the v0.9 (13 phases) + v1.0 (19 phases) reordered plan to ROADMAP.md,
the AD-series supersession table to PROJECT.md + ARCHITECTURE.md, and
reactivates security-engineer + network-engineer + devops-engineer
personas (implements grill C-05).

---ci---
project: orca
phase: 0
milestone: v0.9
status: specify
---/ci---
2026-08-05 16:01:06 +00:00
Jon Chery 8b19c9ab68 docs(milestone): complete coverage-trust-hardening — v0.8 milestone release
Mark REQ-057..060 Complete in REQUIREMENTS.md, mark v0.8 COMPLETE in
ROADMAP.md, advance config.json phase to 4.

P0 (v0.7.0): pre-execution — specify/clarify/research/plan/grill.
P1 (v0.7.1): coverage round 2 — 9 packages hit tiered floor.
P2 (v0.7.2): SSH trust hardening — --host-key-fingerprint + key-reset
             + v0.6 TOFU ship-defect bugfix + doctor parity.
P3 (v0.7.3): requirements-hygiene gate — make verify-reqs + CI hook.
P4 (v0.7.4): final review + audit + milestone release (this commit).

Review: PASS-WITH-FOLLOWUPS (0 P0, 3 P1+ deferred to v0.9).
Audit: PASS (1 P1 stale-branch-hygiene, pre-existing, post-ship cleanup).
GRILL: 4/4 binding conditions satisfied.

---ci---
project: orca
phase: 4
milestone: v0.8
status: complete
requirements:
  covered: [REQ-057, REQ-058, REQ-059, REQ-060]
  partial: []
---/ci---
2026-08-04 12:25:58 +00:00
Jon Chery a0b3b7439d docs(P00): clarify v0.8 ambiguities (5 decisions, full autonomy)
D-043 P02 chore vs feat (chore — trust-surface hardening, no new capability)
D-044 --host-key-fingerprint placement (node join root, validated on --type proxmox)
D-045 fingerprint format (OpenSSH SHA256:base64)
D-046 key-reset scope (local known_hosts only, not remote authorized_keys)
D-047 coverage tiered floor (70% for retested, 50% for zero-test packages)

---ci---
project: orca
phase: 0
milestone: v0.8
status: clarify
---/ci---
2026-08-04 00:49:05 +00:00
Jon Chery a052bf20f1 docs(init): validate v0.8 specification — coverage & trust hardening
---ci---
project: orca
phase: 0
milestone: v0.8
status: specify
---/ci---
2026-08-04 00:49:05 +00:00
Jon Chery 7bb533c2fb docs(milestone): complete hardening-completion
v0.7 milestone complete. All 4 execution phases + final review shipped.
REQ-053..056 all complete. Tags v0.6.0..v0.6.5 on v0.6.x patch line.
Merged milestone/v0.7-hardening-completion → main.

---ci---
project: orca
phase: 5
milestone: v0.7
status: complete
requirements:
  covered: [REQ-053, REQ-054, REQ-055, REQ-056]
  partial: []
---/ci---
2026-08-04 00:29:51 +00:00
Jon Chery afcd15cde4 docs(P04): complete pprof-daemon phase — shipped v0.6.4
REQ-056 complete. I-308 (deferred since v0.2) implemented. Tag + merge +
Gitea release succeeded.

---ci---
project: orca
phase: 4
milestone: v0.7
status: complete
requirements:
  covered: [REQ-056]
  partial: []
---/ci---
2026-08-04 00:22:39 +00:00
Jon Chery f8b135e7a8 docs(P03): complete coverage-uplift phase — shipped v0.6.3
REQ-055 complete. All 4 target packages ≥ 50% (engine 65.1%, transport
84.6%, proxmox 82.7%, audit 100%). Latent dispatch.go EOF bug fixed.

---ci---
project: orca
phase: 3
milestone: v0.7
status: complete
requirements:
  covered: [REQ-055]
  partial: []
---/ci---
2026-08-04 00:19:20 +00:00
Jon Chery 007d3a12e8 docs(P02): complete config-parser phase — shipped v0.6.2
REQ-054 complete. Tag + merge + Gitea release succeeded.

---ci---
project: orca
phase: 2
milestone: v0.7
status: complete
requirements:
  covered: [REQ-054]
  partial: []
---/ci---
2026-08-04 00:09:56 +00:00
Jon Chery 27f2abf8fb docs(P01): complete cert-register phase — shipped v0.6.1
REQ-053 complete. Tag + merge + Gitea release succeeded.

---ci---
project: orca
phase: 1
milestone: v0.7
status: complete
requirements:
  covered: [REQ-053]
  partial: []
---/ci---
2026-08-04 00:05:45 +00:00
Jon Chery bd4a34daa2 docs(init): validate v0.7 specification — hardening & completion
---ci---
project: orca
phase: 0
milestone: v0.7
status: specify
---/ci---
2026-08-03 20:28:05 +00:00
Jon Chery 55d4d699a3 docs(milestone): complete node-bootstrap-proxmox
Milestone v0.6 complete. All 6 requirements (REQ-047..052) shipped
across 3 execution phases + final review. Tags v0.5.0..v0.5.4.

---ci---
project: orca
phase: 4
milestone: v0.6
status: complete
requirements:
  covered: [REQ-047, REQ-048, REQ-049, REQ-050, REQ-051, REQ-052]
  partial: []
---/ci---
2026-08-03 20:02:44 +00:00
Jon Chery fd2c57afeb docs(init): validate v0.6 specification
---ci---
project: orca
phase: 0
milestone: v0.6
status: specify
---/ci---
2026-08-03 19:32:53 +00:00
Jon Chery 2a711dfa6d docs(milestone): complete v0.5-distribution
All 6 requirements complete:
- REQ-041: unified ORCA_HOME namespace root (P1, v0.4.2)
- REQ-042: --system flag for /root/.orca (P1, v0.4.2)
- REQ-043: install.sh 1-liner from public Gitea (P2, v0.4.3)
- REQ-044: in-place update preserves state (P2, v0.4.3)
- REQ-045: repo + releases publicly accessible (P0, v0.4.1)
- REQ-046: docker image on Gitea container registry (P3, v0.4.4)

E2e verified: unauth releases API (200), fresh install, update-in-place,
  ORCA_HOME namespace, --system, docker pull + run.

---ci---
project: orca
phase: 4
milestone: v0.5
status: complete
requirements:
  covered: [REQ-041, REQ-042, REQ-043, REQ-044, REQ-045, REQ-046]
  partial: []
---/ci---
2026-08-03 18:55:50 +00:00
Jon Chery a22c41164f docs(init): validate v0.5 specification
---ci---
project: orca
phase: 0
milestone: v0.5
status: specify
---/ci---
2026-08-03 17:58:32 +00:00
Jon Chery df58bc25a3 docs(milestone): complete scheduling-streaming (v0.3)
---ci---
project: orca
phase: 3
milestone: v0.3
status: complete
requirements:
  covered: [REQ-022, REQ-030, REQ-032]
  partial: []
---/ci---

v0.3 milestone merged to main. Includes all v0.2 work (P08-P10) that
was previously on the milestone branch but not yet merged to main, plus
the v0.3 completion work (iter.Seq streaming + doctor network/db).

v0.2 phases included: P08 (mTLS), P09 (scheduling), P10 (security scan).
v0.3 phases: P0 (pre-execution), P1 (iter.Seq streaming), P2 (doctor),
P3 (final review+ship).

Total: 40 requirements, all complete. No new go.mod dependencies.
Full test suite passes under -race. gofmt + go vet clean.
2026-08-01 20:06:47 +00:00
ciagent f503404dda docs(audit): fix .ciagent/ file discipline findings from v0.2 P01 audit
CIAgent audit (.ciagent/AUDIT_v0.2_P01.md) surfaced 3 .ciagent/ file
discipline issues. This commit addresses all 3:

1. config.json: re-add the 'workflow' top-level block. It was added in
   d10f89d (v0.1 milestone) and lost from main during the parallel-
   history resolution that produced origin/main's be9afa2 PR-#1 merge.
   The 4 standing rules (no_hitl, release_flow_per_phase, merge_strategy,
   branching) are restored.

2. PROJECT.md: add literal '## What This Is' and '## Key Decisions'
   section headers. The v0.1 audit-fix (f1c55ca) added the content
   inline but without the explicit headers, so the audit check missed
   them. The Key Decisions section summarizes D-011..D-018.

3. REQUIREMENTS.md: consolidate two overlapping REQ tables (the v0.1
   status table and the v0.2 traceability table) into a single
   canonical table covering all 40 REQs (REQ-001..REQ-040). Each row
   has REQ-ID, summary, priority, phase, status. v0.1 REQs show
   'Complete'; v0.2 REQs show 'Complete' (P01 shipped) or 'Pending
   (P##)'. The v0.1 Milestone Summary and v0.2 Milestone Summary
   sections are preserved below the table.

4. AUDIT_v0.2_P01.md: the audit report itself, with reconstruction
   state, file discipline table, branch hygiene, commit discipline,
   and the 3 findings above (plus non-blocking observations). The
   report's verdict: 'v0.2 P01 ship is healthy; 3 issues are
   paper-cleanup items addressed in this commit. None block P02
   EXECUTE.'

---ci---
project: orca
phase: 0
milestone: v0.2
status: fix
---/ci---
2026-06-03 22:19:45 +00:00
Jon Chery 1ee82fc2e2 docs(P00): ideation - 34 ideas accepted
v0.2 IDEATE stage. 29 new ideas generated (10 Tier 1 mechanical + 11
Tier 2 backend-enriched + 8 Tier 3 cross-project) plus 6 research-stage
candidates (REQ-cand-A..F from commit 08d321f) = 35 considered. Under
full autonomy, all 35 with confidence >= 0.60 are auto-accepted; 1
explicitly deferred to v0.3 (I-308 pprof). 34 accepted into v0.2.

Resulting net-new REQs (REQ-025..REQ-040) span P01-P04:
- P01 (mTLS): REQ-025 (cert rotation history), REQ-026 (CA fingerprint
  pinning), REQ-032 (orca doctor), REQ-033 (file mode enforcement),
  REQ-034 (rotation alarm), REQ-035 (cert show redaction), REQ-036
  (SAN validation), REQ-038 (mTLS failure log fields)
- P02 (multi-node): REQ-028 (NodeCapacity HCL schema, P02 enabler),
  REQ-037 (X-Orca-Idempotency-Key)
- P03 (security CI): REQ-027 (govulncheck offline mode -- changes P03
  scope: CI must not call vuln.go.dev), REQ-029 (gitleaks baseline for
  pre-existing .env leak), REQ-039 (.gitleaks.toml stopwords),
  REQ-040 (.golangci.yml)
- P04 (iter.Seq): REQ-030 (--watch --json mode)
- Cross-cutting: REQ-031 (go test -race)

Total v0.2 REQs: 20 (4 carried from v0.1 + 16 net-new).

ARCHITECTURE.md: added `internal/doctor/` component (§5) with
orca doctor {cert,network,db} subcommands; ASCII diagram updated.
ROADMAP.md: per-phase REQ coverage matrix added; P03 scope change
documented (govulncheck offline mode).
PROJECT.md: unchanged (vision is stable).

---ci---
project: orca
phase: 0
milestone: v0.2
status: ideate
---/ci---
2026-06-03 21:03:59 +00:00
ciagent 907f25e20d docs(init): validate v0.2 specification
Validates the v0.2 milestone specification against the deferred-v0.2
requirements in ROADMAP.md and the requirement status table. Updates:

- ROADMAP.md: v0.2 marked in-progress with 4 phases (P01 mTLS, P02
  multi-node scheduling, P03 gosec+govulncheck, P04 iter.Seq). Adds
  target milestone tag (v0.3.0) and per-phase tags (v0.2.1..v0.2.4)
  per the feature-milestone promotion rule and the RELEASE_POLICY.md
  standing rule on per-phase releases.
- REQUIREMENTS.md: flips REQ-011, REQ-014, REQ-022, REQ-023 from
  'Deferred (v0.2)' to 'Pending (v0.2 PXX)'. Adds a v0.2 summary
  section.

No code or schema changes. Pure SPECIFY output per run.md Step 3.
CLARIFY and RESEARCH follow.

---ci---
project: orca
phase: 0
milestone: v0.2
status: specify
---/ci---
2026-06-03 20:52:01 +00:00
cloudinit-bot be9afa2d2c ship: v0.1 Foundation milestone complete (#1) 2026-06-03 20:08:57 +00:00
Jon Chery 55aae5347e chore(P00): rename orch-engine to orca, configure gitea + coreci (v0.1)
---ci---
project: orca
phase: 0
milestone: v0.1
status: execute
---/ci---
2026-06-03 11:36:32 +00:00
Jon Chery 97f437f9ef docs(init): initialize orch-engine (6 phases)
---ci---
project: orch-engine
phase: 0
milestone: v1.0
status: specify
decisions:
  - id: D-001
    decision: Use single-project mode for initial setup
    rationale: Simplified configuration for the initial phase
    confidence: 1.0
    alternatives: []
---/ci---

Specification: Build an offline/CLI-first orchestration engine.
Requirements: Simplicity, AI-first, Offline-first, CLI-first, prioritize security/bug-fixes over features, Go 1.25+.
Constraints: Simpler than Nomad, far simpler than Kubernetes.
Out of scope: K8s complexity.
2026-06-03 10:59:05 +00:00