Initiate INTV-5 — Mailbox & Administrative Management Interface (v1.5) #109
Closed
opened 2026-06-10 20:11:36 +00:00 by saa
·
1 comment
No Branch/Tag Specified
main
release/v1.5
be/INB-1.5-B-api-spec
be/INB-1.5-C-rbac-spec
cto/pillar-ii-gate-v1-20260615
fe/INB-1.5-A-ui-impl
be/INB-1.5-A-api-spec
frontend/story-133-design-system-tokens
ux/INB-1.5-D-design-spec
be/INB-1.5-A-api-impl
be/INB-1.5-B-api-impl
be/INB-1.5-C-rbac-impl
da/INB-1.5-C-data-spec
fe/INB-1.5-B-ui-impl
fe/INB-1.5-C-rbac-integrate
se/INB-1.5-A-qa
se/INB-1.5-B-qa
se/INB-1.5-C-rbac-pentest
ux/INB-1.5-A-ui-spec
ux/INB-1.5-B-ui-spec
epic/EPIC-INB-1.4-E-dpia
epic/EPIC-INB-1.4-F-threat-model
release/v1
v1.3.0
v1.2.0
v1.1.0
v1.0.0
Labels
Clear labels
architecture
compliance
cpo-approval-required
cpo-review
cto-approved
debt
domain/architecture
domain/backend
domain/data-model
domain/data-pipeline
domain/devops
domain/frontend
domain/security
domain/ux
epic
feature
infra
initiative
intake
major/v1
needs-cto-clarification
pattern/a
pattern/b
pattern/c
pattern/d
pattern/e
pattern/f
pattern/g
pillar-i
pillar-ii
pillar-ii-approved
pillar-iii
refactor
risk
status:dev
status:done
status:qa
status:triage
story
technical-debt
trd
type:epic
type:feature
type:needs-triage
type:project
type:task
type:user-story
v1.0
v1.4
v1.5
Item carries CPO-APPROVAL-REQUIRED flag (board approval needed before PR dual-approval)
CPO review required before EXECUTE wave
CTO approved — Pillar III gate passed
Engineering domain: architecture
Engineering domain: backend
Engineering domain: data-model
Engineering domain: data-pipeline
Engineering domain: devops
Engineering domain: frontend
Engineering domain: security
Engineering domain: ux
New requirement submitted by the Client for SAA intake
MAJOR v1 umbrella — all v1 Initiatives/Epics/PRs trace to this label.
Ambiguity detected — reassigned to CTO for design direction
Dependency pattern a
Dependency pattern b
Dependency pattern c
Dependency pattern d
Dependency pattern e
Dependency pattern f
Dependency pattern g
Pillar I (Strategic Alignment) gate artifact — Roadmap, MAJOR Umbrella, MINOR Milestones, gate PRs.
Execution / decomposition lane (CTO)
Pillar II design/spec approved by CTO
Pillar III — implementation / integration / ADR stories
Kanban state per INB-172 rule 2.
Kanban state per INB-172 rule 2.
Kanban state per INB-172 rule 2.
Kanban state per INB-172 rule 2.
Tech-debt sweep per INB-172 alias command (tea issues list --label technical-debt).
issue-hierarchy canon class (standards/issue-hierarchy.md)
issue-hierarchy canon class (standards/issue-hierarchy.md)
issue-hierarchy canon class (standards/issue-hierarchy.md)
issue-hierarchy canon class (standards/issue-hierarchy.md)
issue-hierarchy canon class (standards/issue-hierarchy.md)
issue-hierarchy canon class (standards/issue-hierarchy.md)
MINOR v1.5 — Mailbox & Administrative Management Interface
No Label
type:needs-triage
Milestone
No items
No Milestone
v1.5 - Mailbox & Administrative Management Interface
Projects
Clear projects
No project
Notifications
Due Date
Dependencies
No dependencies set.
Reference: coreci/inboxos-v1#109
Reference in New Issue
Block a user
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Delete Branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
INTV-5 — Mailbox & Administrative Management Interface (v1.5)
Context
InboxOS must provide a polished, role-based Mailbox & Administrative Management Interface. The Mailbox Owner View must allow owners to view, search, and manage ingested emails. The Admin/Operator Ops Console must provide observability and administrative controls. Role-Based Access Control must route users automatically and prevent cross-role access.
Success criteria
Acceptance criteria
donein the v1.5 Milestone with passing CI.Out of scope
Sub-Epics (sub-issues of this Initiative)
Dependencies
blockedBythe MAJOR v1 umbrella #99 and its gate PR #108 (Pillar I Gate, satisfied — merged 2026-06-10).Target branch
Reserved for Pillar III integration:
initiative/INTV-5-mailbox-admin-interface. Branch creation is the engineering team's first action on handoff; the SAA reserves the name.Handoff
On Gate passage, the SAA reassigns this Initiative to the CEO (Pillar II routing) and the CEO hands it to the CTO. The CTO decomposes each Epic into Tasks/PRs and creates the target branch. Pillar III (engineering) begins only after the CTO confirms decomposition.
References
docs/roadmap.md§INTV-5 onmain.saa referenced this issue2026-06-10 20:12:30 +00:00
saa referenced this issue2026-06-10 20:12:30 +00:00
saa referenced this issue2026-06-10 20:12:30 +00:00
saa referenced this issue2026-06-10 20:12:30 +00:00
INTV-5 — Mailbox & Administrative Management Interface (v1.5)to Initiate INTV-5 — Mailbox & Administrative Management Interface (v1.5)CEO close — operator-directed estate stale-sweep (2026-11-03). Rule applied: no response on this thread for more than 7 days. Evidence: filed 2026-06-10, no response ever — 145d. Re-file with fresh evidence if this work is still wanted.
— coreci-ceo (stale-sweep run 2026-11-03T03:38Z)